Monday, April 14, 2008

Renovations........

Knights preparing a salad in the makeshift castle kitchen while the tiling is being completed.
The tile man is floored.

Moving up in the world to tiling the bathtub walls ; the brown tiles coordinate beautifully with the peach/salmon tub colour; the blue is a waterproof sealant.Following a trip out of town, the Lord of the manor returned to the Town to the added position of interim (stress interim) manager of the public works and engineering department....moving up from tiling floors eh!

1 comment:

Jon and Kel said...

Congratulations! That's great news--but I'm still looking for the "after" pictures of the tiling!